Do you need planning permission to change internal?

Do you need planning permission to change internal?

Permits to change a roof

Simple, visit the help page of the city council of Madrid, fill in the fields and follow the indications (address of the building and type of work to be done). At the end it tells you the type of license you need. Madrid City Council. Munimadrid.es

The city council does not usually ask for a license when painting, replacing floors, tiling, or replacing plumbing, electricity or heating installations, as long as the building is not listed.

The works that require the intervention of a technician for their execution are large-scale works such as the construction of houses, rehabilitation of protected buildings, changes in the structure of a building (pillars, beams, load-bearing walls, etc.).

1- The Urban Development Tax that is paid when applying for the license. It is the cost of the municipal technicians who process the dossier. The rates are around 200 € onwards, depending on the meters that we are going to modify.

Yes, any construction or extension project requires a project drawn up by a technician and a request for a license from the corresponding town hall. Regardless of the size of the extension.

What works can be done without a license

Simple, visit the help page of the city council of Madrid, fill in the fields and follow the indications (address of the building and type of work to be done). At the end it tells you the type of license you need. Madrid City Council. Munimadrid.es

Read more  How wide can a load be on UK roads?

The city council does not usually ask for a license when painting, replacing floors, tiling, or replacing plumbing, electricity or heating installations, as long as the building is not listed.

The works that require the intervention of a technician for their execution are large-scale works such as the construction of houses, rehabilitation of protected buildings, changes in the structure of a building (pillars, beams, load-bearing walls, etc.).

1- The Urban Development Tax that is paid when applying for a license. It is the cost of the municipal technicians who process the dossier. The rates are around 200 € onwards, depending on the meters that we are going to modify.

Yes, any construction or extension project requires a project drawn up by a technician and a request for a license from the corresponding town hall. Regardless of the size of the extension.

Fine for changing windows without a permit

The competence to legislate on Urbanism, Territorial Planning, Land, Activity or Urban Planning corresponds to the Autonomous Regions. In all of them a Title or Chapter is dedicated to municipal intervention in building and land use. It is here where the urban planning license and the acts that are subject to it are defined.

The municipalities are given the power to develop in ordinances the processing of urban planning licenses, as well as to define more rigorously the acts subject to licensing and those not subject to licensing.

Practically all acts of construction or land use are subject to licensing, however, within our housing, municipal intervention is considerably reduced since in most cases they are conservation works.

Read more  Should you put plastic under concrete driveway?

It is in these elements (the facades) where the City Councils are competent, as well as having the obligation, to regulate and legislate in order to make towns that are not chaotic, that are pleasant to live in, in short, that are “livable” cities.

Building permit price

First of all, it is necessary to bear in mind that, although there are general norms in the Law of Urbanism, they are the city councils those that classify the types of works and the permissions that require each one, in the respective municipal ordinances. If for example one wants to reform an apartment in Sabadell, it is to the City council of Sabadell where it is necessary to make the consultation before beginning any reform.

Major works are considered to be those that affect the structure of the dwelling, for example, building a new floor or when the reform is to change the main use of the building. In this case, a licensing regime is required, which consists of presenting a project signed by a licensed technician, together with a series of documentation specified by each municipality. Once the documentation and the adequacy of the work to the regulations have been analyzed, the license is granted to start the works. Only then, the work can begin.

The minor works are those in which the structure of the house or its habitual use is not modified. In this case it is not necessary to present a project signed by a technician. The minor works do not require a license, if not that it is processed as a communication and only it is necessary to present the documentation that stipulates the city council in question to initiate the works.

Read more  Is a wet room classed as Zone 1?